03-09-17, 10:14 AM
I have 3 (2 es7x and a 9x) MFDs I am going to daisy chain. They are laid out with the 9" being the master and at the helm. The 7s are on the tower and in the overhead e box and are connected via raynet. Getting the cables routed are the tricky thing. When I connect to the seatalk ng net work, does the master have to be the one the seatalk spur goes to or can a slave have the hook up?