Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
[CA] [CA11] Network Schematic
02-04-19, 02:07 PM
Post: #2
RE: [CA11] Network Schematic
Welcome to the Raymarine Forum Smuznu,

Q1. I am curious if the attached network schematic is correct?
A1. General comment: Per the FAQ found here, for simplicity and reliability, it is considered to be a best practice that the NMEA 2000 backbone be constructed from SeaTalkng / NMEA 2000 networking components of a single manufacturer rather than create the backbone shown within your diagram.

The diagram which you have submitted is incorrect in the following ways:

- the diagram incorrectly shows a DeviceNet to SeaTalkng Spur adapter being used to join the two backbones. As indicated within the FAQ referenced above, a SeaTalkng backbone cable and a Maretron Micro/Mid Field Attachable Connector of the correct gender would be used for this purpose.

- the diagram incorrectly shows that the E70196 VHF NMEA 0183 to STng Converter Kit has been interfaced as a spur to the backbone (i.e. connected to white spur socket). The SeaTalk to SeaTalkng Converter included this kit is designed to be installed as a backbone component. Accordingly, the SeaTalk to SeaTalkng Converter included this kit should be connected to one end of the backbone via an appropriate length of SeaTalkng Backbone Cable which will be connected to one of its backbone sockets. Alternatively, the SeaTalk to SeaTalkng Converter included this kit may installed at any point within the middle of the backbone where each of its backbone (blue) sockets will be connected to a SeaTalkng T-Piece or 5-Way Connector via an appropriate length of SeaTalkng Backbone Cable.

Q2. Is the power from the ACU200 enough to power the network or should I use the independent Garmin power cable (yellow) and turn the power from the ACU200 off?
A2. Negative. It is recommended that the ACU200's SeaTalkng Power switch be configured to the OFF position and that either the SeaTalkng Power Cable (supplied with the Evolution autopilot and E70196 VHF NMEA 0183 to STng Converter Kit) or the Garmin backbone power cable be connected to a switched 12VDC power circuit and that it be used to power the backbone.

Q3. Is the NMEA 2000 to STng cable properly connected? Wasn’t sure if I can use the blue backbone port or if I have to use a white spur cable port.
A3. See the response to Q1.

Q4. Is the NMEA 0183 for my ICOM M400BB hooked up properly?
A4. Please click here to view a FAQ addressing this subject ... specifically which leads of the supplied cable will be interfaced to the VHF radio's NMEA 0183 Input leads / terminals.
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
[CA11] Network Schematic - Smuznu - 02-02-19, 01:39 PM
RE: [CA11] Network Schematic - Chuck - Raymarine - Moderator - 02-04-19 02:07 PM
RE: [CA11] Network Schematic - Smuznu - 02-06-19, 08:16 PM
RE: [CA11] Network Schematic - Smuznu - 02-07-19, 10:58 PM
RE: [CA11] Network Schematic - Smuznu - 02-27-19, 09:40 PM

Forum Jump:


User(s) browsing this thread: 2 Guest(s)