Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
upgrade c120
02-19-16, 02:23 PM
Post: #4
RE: upgrade c120
The eS127 has two Ethernet Network sockets. If a HS5 RayNet Network Switch will not be installed, then the CP100 and radar will be connected to the MFD's Ethernet Network sockets. The currently installed 600W transducer will be adapted (w/E66066 Transducer Adapter Cable) to mate to the eS127 MFD's Transducer socket. The CHIRP/DownVision transducer will be interfaced to the CP100's Transducer socket.
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
upgrade c120 - Sallysea - 02-19-16, 12:24 PM
RE: upgrade c120 - Sallysea - 02-19-16, 02:17 PM
RE: upgrade c120 - Chuck - Raymarine - Moderator - 02-19-16 02:23 PM
RE: upgrade c120 - Sallysea - 02-19-16, 03:21 PM
RE: upgrade c120 - Sallysea - 02-19-16, 04:35 PM
RE: upgrade c120 - Sallysea - 02-20-16, 12:01 AM

Forum Jump:


User(s) browsing this thread: 1 Guest(s)