Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
0.5 L Hydraulic pump spec discrepancy
07-26-16, 04:08 PM
Post: #25
RE: 0.5 L Hydraulic pump spec discrepancy
Contrary to the instructions, with an EV100 hydraulic pilot it is recommended that the pump's motor A & B leads be connected directly +12V and -12VDC when bleeding. After bleeding has been completed, the Dockside Wizard should be performed to simply ensure that the pump motor's A & B leads have been connected to the proper terminals of the ACU-100. Should the drive move in the incorrect direction, then the motor lead connections to the ACU-100 should be reversed and the system should be tested again.
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
RE: 0.5 L Hydraulic pump spec discrepancy - Chuck - Raymarine - Moderator - 07-26-16 04:08 PM

Forum Jump:


User(s) browsing this thread: 1 Guest(s)