Ev 200 Hynautic installation update
|
08-28-16, 07:52 PM
Post: #1
|
|||
|
|||
Ev 200 Hynautic installation update
Upon further review I have the two line pressurized system. This diagram is on page 15 figure 7 in your hydraulic pump installation guide.I will set it up the way the diagram shows it instead of trying to T it immediately as it comes out of the reservoir. Was a little confusing as I have three lines and it is called a 2 line system.
|
|||
08-29-16, 03:07 PM
(This post was last modified: 08-29-16 03:08 PM by Chuck - Raymarine - Moderator.)
Post: #2
|
|||
|
|||
RE: Ev 200 Hynautic installation update
Welcome to the Raymarine Forum mr 88,
Your comments have been noted. For the benefit of others seeking to understand the hydraulic pump installation, the diagram is shown below: |
|||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 1 Guest(s)