[CA] [CA11] STLK Fail Lightning Issue
|
11-07-18, 02:11 PM
Post: #23
|
|||
|
|||
RE: [CA11] STLK Fail Lightning Issue
Thanks again Chuck! Please see revised diagram attached. I have edited based on your notes (ie. I updated the network switch connection). However, I have reverted back to daisy-chaining two of the binnacle pod instruments to simplify the wiring. I recognize you said that this is not best practice, but after considering where the two 5-way connectors will sit (one outside in the binnacle pod and one inside at the nav station) I think this makes the most sense. If there are major reasons (other than it isn't best practice) to not daisy-chain like this, please advise. Also, noted about the blanking plug. I have incorporated that now since one spur socket will be empty on the inside 5-way connect. I look forward to your feedback. Cheers!
|
|||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 5 Guest(s)