[CA] [CA11] Network Setup/LEMS
|
03-28-19, 07:44 AM
Post: #6
|
|||
|
|||
RE: [CA11] Network Setup/LEMS
General comment. Rather than installing the i70 within the pod, I would recommend that you consider installing it somewhere below decks or within a storage location which may be easily accessed for during calibration (not necessarily by the operator, but potentially by crew or a passenger onboard who will help out with calibration).
Q. Where shall I connect the new instrument? Can I put it anywhere on the network or does the “out†of the I70 need to go directly to the ES128? A. The i70S/i70 MFID cannot be directly interfaced to a MFD. Like the MFD, the i70/i70S MFID is designed to be interfaced to a spur socket within the system's SeaTalkng/NMEA 2000 backbone. Should there not be an unused spur socket within the backbone, then an additional spur socket will need to be added. |
|||
« Next Oldest | Next Newest »
|
Messages In This Thread |
[CA11] Network Setup/LEMS - Sadey - 03-25-19, 07:00 AM
RE: [CA11] Network Setup/LEMS - Chuck - Raymarine - Moderator - 03-26-19, 09:51 AM
RE: [CA11] Network Setup/LEMS - Sadey - 03-26-19, 06:15 PM
RE: [CA11] Network Setup/LEMS - Chuck - Raymarine - Moderator - 03-27-19, 08:23 AM
RE: [CA11] Network Setup/LEMS - Sadey - 03-28-19, 06:22 AM
RE: [CA11] Network Setup/LEMS - Chuck - Raymarine - Moderator - 03-28-19 07:44 AM
|
User(s) browsing this thread: 4 Guest(s)