Upgrades to Existing Raymarine System on B35.5
|
11-25-16, 03:54 PM
Post: #5
|
|||
|
|||
RE: Upgrades to Existing Raymarine System on B35.5
The STNG system that the p70 controller and SPX-5 course computer are connected to is powered by the SPX-5, which is connected to the DC breaker panel. I plan to disconnect the STNG power cable from this system when I connect this system to the instrument system with a backbone cable. The instrument system will then provide the power to the expanded STNG system. Do I also need to disconnect the SPX-5 from the DC breaker panel, or does it need to remain connected to provide power to the wheel drive unit which is also connected to the SPX-5?
|
|||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 6 Guest(s)